Designed by Zaha Hadid Architects
Building Integration by Lead Dao Technology & Engineering
澳底藝術館
2011-2014
This project has collaborated with clients, architect and consultants to achieve a cohesive integrated design. Overall the geometry has brought to us a tough challenge, nothing is followed the Cartesian Grid besides the elevator core. Therefor, an advanced computer aided software and technology are applied onto it. The outer FRC skin has been rationalized to custom mold. The structure center-lines have precisely placed for engineering calculation.
該項目與客戶, 建築師和顧問們合作實現了一致的整合設計. 總體而言, 幾何形狀給我們帶來了一個艱難的挑戰, 除了電梯核心之外, 沒有任何垂直與水平的笛卡爾網格可以遵循. 因此, 在其中應用了先進的計算機輔助軟件和技術, 外部FRC表皮合理化後做為定制模具. 結構中心線也精確從電腦模型中放樣用於結構技師計算.
Reverse engineering process
Illustrating the design in a history based software wherein the model to be reconstructed from a manufacturer stand point.
逆向工程
下圖顯示從參數關聯性的軟體中的逆向工程過程, 最主要是從製造商的角度重建模型來發展後續施工建造.
Integrated model
Digital representation of the building available for design decision making, conflict detection, and construction documentation. A 3D building model which allowed fabricators, erectors, and
constructors to view building components layer by layer with a 360 degree viewpoint
for exceptional detail, thereby removing ambiguity, ensuring design intent realization, supporting
accurate fabrication and construction, and reducing change orders and requests for information.
整合模型
建築數位模型可用於設計決策, 衝突檢測和施工文檔. 一個3D建築模型, 允許製造商, 施工單位以360度視角逐層查看構建組件獲得細節, 從而消除歧義, 確保設計意圖實現, 支持準確的製造和施工, 減少變更和提供需要的信息數據請求.